国产一区二区极品_天堂资源中文WWW_国产成人精品av_黄色国产精品_日韩欧美福利_中文字幕欧美在线

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :4430 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: m.dgjura.cn

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 免费的黄| 99精品视频免费热播在线观看 | 国产黄色一级大片 | 欧美四区 | 九九九九九少妇爽黄大片 | 亚洲日本乱码一区两区在线观看 | www.国产精品.com | 国产v日韩v欧美v在线观看 | 一区二区不卡av | 最新av在线网址 | 色88888久久久久久影院 | 亚洲日韩蜜桃av在线观看 | 性一交一乱一色一免费无遮挡 | 中文字幕亚洲自拍 | 97久久亚洲 | 中文字幕乱在线伦视频中文字幕乱码在线 | 亚洲AV综合永久无码精品天堂 | 字幕日韩视频一区二区 | mimiai最新网站入口 | 国产乱理伦片在线观看 | 精品无人乱码一区二区 | 日韩免费区 | 无码av片在线观看免费 | 亚洲久久色| 日本免费无遮挡吸乳视频网站 | 日本亲子乱子伦xxxx | 久久精品成人无码观看56 | 久999| a中文字幕www| 国产亚洲精品俞拍视频 | 水牛影视一区二区三区久 | 亚洲大片精品永久免费 | 国产精品久久久福利 | 国产露脸无码A区久久 | 超清无码无卡中文字幕 | 五月香丁激情欧美啪啪 | 亚洲欧美日韩中文视频 | 亚洲日本乱码一区两区在线观看 | 91在线高清 | 国产天天草| 欧美一级特黄aaa大片在线观看 |